Greetings from the New Fountain of Life Chapel under construction in Ho, Ghana Africa. We would like to take you inside for a short tour, but let’s first take a trip back in time and see how we have arrived to this point of construction.
Fountain of Life Chapel is a vision of Senyo and Augustine Cudjoe dating back to the early 2000’s. They started out meeting at there home in Ho.

Sometime around 2007-08 they purchased a piece of property with the vision of someday having a chapel building. On a trip in 2009 team members along with members of the church gathered to pray over the land.

A few years passed, but in August of 2012 construction started and the first small chapel building was completed and opened in December of 2013.




Between 2013 and 2015 a second small building was built. This was constructed as the children’s ministry building. Seen in the background of the following picture.

Once again time passed and in December of 2017 work began on the larger main chapel building. Over the next several years work continued off and on as the Lord provided the funding.









trusses going up

roofing is completed

exterior being plastered

doors and security bars being installed

to were we are today!
Now come with us and let’s go inside! Entering through the front doors you come into the main sanctuary, and in front of you is the stage and baptism area through the arch.

This is the view from the stage looking back across the sanctuary.

Above the front entrance following the stairs on the right. They take you up to the video and sound equipment rooms.

As stated before, the area in back of the stage and through the center arch is the baptismal.

Directly under the stage and baptismal area is what Senyo has called the Glory Room. This is a place dedicated as a prayer room.

Also on this lower level there’s room for a restroom


along with office spaces that are still unfinished.
Now back upstairs and behind the block wall and on either side of the baptismal area there’s plenty of room for more offices, a changing room and two more rest rooms. Once again these areas are still under construction and unfinished.

This is the corridor behind the stage leading to the back offices and restrooms.




As you can see, we have come a long ways and much has been accomplished. But there is a lot of work to be done still. We ask that you to join us in prayer, as we continue seeking ways to see this construction through to completion. Lord we thank you for all that you have provided and continue to provide. All Glory is yours!